Pistons & Connecting Rods

Applies to all engine variants (SOHC and DOHC) — the manual heads this section “Pistons & Connecting Rods: All.”

Component removal order

  1. Nut
  2. Connecting rod cap
  3. Connecting rod bearing
  4. Piston & connecting rod
  5. Connecting rod bearing
  6. Piston ring No.1
  7. Piston ring No.2
  8. Oil ring
  9. Piston pin
  10. Piston
  11. Connecting rod
  12. Bolt

Figure: Piston & connecting rod exploded view, bolt torque callout

Connecting rod bolt torque (as scanned)

The diagram shows a fragment: “13±2 4m” / “+80°-84°” next to item 12 (bolt).

(verify printed p.102) — this reads as a possible torque-to-yield (TTY) spec: an initial torque figure (garbled — could be 13±2 N·m or similar) followed by an additional rotation angle of 80°-84°. Neither the base torque number nor the angle range should be treated as confirmed; the OCR could not cleanly separate digits from the surrounding balloon numbers (“12,” “1,” “26,” “11”). Do not torque connecting rod bolts to a guessed value — confirm against a clean scan before overhaul.

Piston pin removal

Tools required:

  • MD991539 — Guide A
  • MB991540 — Guide B
  • MB991538 — Guide C / push rod

Procedure: place tools Guide A and Guide C as shown, place the piston assembly on piston base MD999583, and press out the piston pin.

Note: Always use connecting rods from their original cylinder location. If a new rod is used, mark the cylinder location as shown.

Figure: Piston pin removal with Guide A/B/C tools and piston base MD999583

Piston pin installation

Same tool set as removal (Guide A/B/C, push rod).

Note: The “Front Mark” must correspond on both the piston and connecting rod as shown.

Note: Cylinder bore/piston size markings are stamped on the piston. If boring or piston sizes have changed, stamp out old markings and re-stamp with the new size.

Figure: Piston pin installation diagrams, front-mark alignment, bore size markings

Required press force: 4900-10,780 N (matches the Engine Specifications table — confirmed).

Figure: Piston pin press setup on base MD999583

Oil ring installation

Note: Proper oil ring installation is required to prevent excessive oil consumption. The two side rails and spacer must be installed as shown.

Note: Side rails should be opposite as shown in the diagram — ring gap at the 6 o’clock position, side rails at 9 & 3 o’clock.

Ring identification (oil ring side rail)

SizeColor mark
STDN/A (no mark)
0.25mm OSBlue stripes (2)
0.50mm OSYellow stripe (1)

Ring identification (compression rings)

SizeMark
STDNo mark
0.25mm OS”25”
0.50mm OS”50”

Ring position codes: 1R = top ring, 2R = second ring.

Figure: Oil ring side-rail/spacer installation and ring identification marks

Connecting rod bearing size marks

Note: Factory size bearing markings are stamped on the crankshaft, as shown in the diagram. Check the Parts Manual for updates and changes to markings.

(verify printed p.106) — the bearing color-code table lost its row/column alignment in OCR. Recovered fragments suggest three size bands identified by tick-mark count (|, ||, |||) crossed with a color (Brown, No Color, Blue/White), against three connecting-rod pin diameter ranges:

Pin diameter range (as scanned)
35.995-36.000mm (1.4171–1.4173in)
35.985-35.995mm (1.4167–1.4171in)
35.980-35.985mm (1.4165–1.4167in)

Do not assign a specific color/mark combination to a specific pin-diameter range from this table — the OCR order does not reliably preserve which color goes with which range. Confirm against a clean scan or the Parts Manual before selecting a replacement bearing.

Piston/ring installation to block

Note: Ensure side rail (ring gaps) are facing the proper direction for installation. Coat the piston and rings heavily with assembly lube and/or 30W SAE engine oil. Never install pistons “dry” — failure will occur.

Note: Use a proper ring compressor to install pistons into the block. Use a wooden hammer handle or plastic tap rod. Never use a steel or brass handle to install pistons.

Piston ring side gap (confirm before installation):

RingGap
No.1 (R1)0.03-0.07mm (0.001–0.003in)
No.2 (R2)0.02-0.06mm (0.001–0.002in)

Connecting rod bearing cap

Note: Ensure caps and bearings are correct for each connecting rod. Grease and install.

Clearance inspection

  1. Rotate engine two full rotations.
  2. Inspect clearance.

Limit: 0.10-0.25mm (0.004–0.010in) — matches the Engine Specifications table’s Connecting Rod (Big End) Clearance figure; confirmed.

Figure: Piston/ring installation to block and connecting rod bearing cap clearance check